Start of the Project: Laying the Foundation for Excellence

This section outlines KNR’s scope of work for the General Installation Works thats completed in 2024. Our focus was on meticulously preparing the designated workspace, installing essential elements, and ensuring a safe and functional work environment.

The project’s success begins with a solid foundation.

  • Site Preparation & Subbase Installation
  • Excavation, Backfilling & Compaction
  • Temporary Shoring & Dewatering Systems (if applicable)

During the Project: Building With Quality and Safety at the Forefront

With the site prepared, KNR focused on installing various components and integrating them into the overall project. Safety remained paramount during this stage, alongside maintaining efficient project flow.

The project’s success begins with a solid foundation.

  • Conduit & Duct Installation
  • Tiles, Warning Tapes & Concrete Protection Slabs (as specified)
  • Quality Control & Progress Monitoring

Finalizing the Project: A Smooth Handover and Ongoing Support

The final stage involved ensuring a smooth handover and providing ongoing support.

The project’s success begins with a solid foundation.

  • Project Handover & Documentation
  • As-Built Drawings & Quality Control Reports
  • Ongoing Support & Collaboration