Provision of Open & Closed Drain System Works

This section covers KNR’s civil works for open and closed drainage systems, including excavation, material installation, backfilling, compaction, protection of existing infrastructure, testing, and site restoration.

Start of Project: Site Establishment & Preparation

  • Site Establishment & Resource Mobilization
  • Material Transportation & Access Preparation
  • Shoring, Sloping & Dewatering Works

During the Project: Earthworks & Drainage Installation

During construction, KNR performs excavation, drainage material installation, backfilling, and compaction while protecting existing infrastructure and maintaining appropriate health, safety, and environmental controls.

2. During the Project: Construction & Quality Control

  • Excavation & Earthworks
  • Drainage Material Supply & Installation
  • Backfilling, Compaction & Existing Infrastructure Protection

Finalizing the Project: Testing, Restoration & Handover

The final stage includes completing required testing and quality inspections, restoring disturbed areas, removing temporary site facilities, and submitting the required project documentation.

Finalizing the Project: Handover and Post-Construction Support

  • Final Testing & Quality Assurance
  • Site Restoration & Demobilization
  • QA/QC Reports & Project Documentation