Complete Water Supply System Design, Construction & Operation
This project covers the complete development and operation of a reliable water supply system, from design and water-resource assessment through construction, installation, commissioning, and long-term operation and maintenance.
Start of Project: Design, Studies & Site Development
- Water Supply Design & Hydrology Studies
- Drilling & Development of Two Water Wells
- Access Roads, Site Preparation & Civil Works


During the Project: Infrastructure Construction & Installation
The main construction phase includes the installation of water supply infrastructure and the integration of civil, electrical, and mechanical systems to establish a complete and functional water distribution network.
2. During the Project: Construction & Quality Control
- Casings, Submersible Pumps & Pipeline Installation
- Transfer Station, Pump House & Diesel Storage Facilities
- Electrical, Mechanical & Supporting Infrastructure


Finalizing the Project: Commissioning & Ongoing Operation
Following construction, KNR conducts comprehensive testing and commissioning before commencing operation and maintenance activities to ensure reliable and continuous water supply.
Finalizing the Project: Handover and Post-Construction Support
- Testing, Commissioning & System Verification
- Relocation & Final Infrastructure Adjustments
- Operation, Maintenance & Repair Services