Main Camp Kitchen & Dining Hall Work

Home / Projects

Project Details

Duration:
2022 – 2023

Client:
Pearl Petroleum ( Crescent – Dana Gas)

Download Brochure

Need an Advice from Expert Team?

Get an Appointment Today!

Start of the Project: Laying the Foundation for Excellence

This section details KNR’s comprehensive scope of work for the Main Camp Kitchen & Dining Hall construction project undertaken for Pearl Petroleum’s Crescent – Dana Gas project, completed between 2022 and 2023. Our commitment was to deliver a fully functional, modern, and comfortable dining facility for the project workforce.

The project’s success begins with a solid foundation.

  • Collaborative Design & Permitting: KNR engineers collaborated closely with Pearl Petroleum to develop a detailed design for the kitchen and dining hall. This design considered factors like capacity, workflow efficiency, regulatory compliance, and adherence to Pearl Petroleum’s specific needs. KNR also secured all necessary permits and approvals before commencing construction.
  • Material Procurement & Quality Control: KNR procured high-quality building materials, equipment, and fixtures for the kitchen and dining hall. Stringent quality control measures ensured all materials met project specifications and industry standards.
  • Civil & Structural Works Planning: KNR’s team meticulously planned the civil and structural aspects of the project. This included foundation construction, wall erection, roof installation, and ensuring the building adhered to the highest safety standards.

During the Project: Building With Quality and Safety at the Forefront

With a comprehensive plan in place, KNR’s skilled workforce executed the construction phase, focusing on quality and timely delivery.

The project’s success begins with a solid foundation.

  • Civil & Structural Construction: KNR constructed the main building structure, adhering to the planned design and incorporating civil works like drainage systems and necessary aesthetic features.
  • Mechanical, Electrical & Control Systems Integration: A team of skilled professionals installed the complete mechanical, electrical, and control systems for the kitchen and dining hall. This included plumbing, HVAC systems, fire suppression systems, high and low voltage power distribution, lighting systems, and proper earthing for safety.
  • Kitchen Equipment Installation & Testing: Specialized kitchen equipment was meticulously installed within the designated spaces. KNR ensured proper functionality and conducted rigorous testing of all equipment to guarantee a safe and efficient food preparation environment.

Finalizing the Project: A Smooth Handover and Ongoing Support

The final stage focused on ensuring a smooth handover of the completed kitchen and dining hall to Pearl Petroleum and providing ongoing support, if required.

The project’s success begins with a solid foundation.

  • Project Handover & Documentation: Upon completion, KNR provided Pearl Petroleum with comprehensive handover documentation. This included detailed architectural drawings, as-built drawings for all systems, operation & maintenance manuals for equipment, and a complete record of all construction activities.
  • System Training & Performance Testing: KNR may have offered training sessions for Pearl Petroleum’s personnel on operating and maintaining the various systems within the kitchen and dining hall. Additionally, final performance tests were conducted to guarantee all systems functioned efficiently and met safety regulations.
  • Ongoing Support & Collaboration: Our commitment extended beyond project handover. KNR remained available to offer Pearl Petroleum ongoing support, addressing any questions or concerns regarding the facilities and providing maintenance services if needed.